Purva Northern Lights: Luxury Apartments in KIADB Aerospace Park, Bagalur

A 24.55 acres township. Starting @ ₹1.11 Cr. RERA: PRM/KA/RERA/1251/309/PR/120326/008523

  • Purva Northern Lights high-rise apartment project typeProject Type
    Apartment Township
  • Location of Purva Northern Lights in KIADB Aerospace Park BagalurLocation
    KIADB Aerospace Park
  • Purva Northern Lights pre-launch price list for luxury apartmentsStarting Price
    ₹1.11 Cr Onwards
  • Purva Northern Lights Project status iconProject Status
    Pre-Launch
  • Purva Northern Lights 24.55 acres township land areaLand Area
    24.55 acres
  • 1, 2, 3 and 4 BHK unit types at Purva Northern LightsUnit Types
    1, 2, 3 & 4 BHK
  • Puravankara Limited official builder of Purva Northern LightsBuilder
    Puravankara Limited
  • Total 2973 luxury apartments at Purva Northern Lights BangaloreTotal Units
    2973 Apartments
  • Purva Northern Lights apartment unit sizes and configurationsUnit Sizes
    408 – 2,400 sq ft
  • 8 High-rise towers at Purva Northern Lights luxury townshipNo. of Towers and Floors
    8 Towers, B + G + 29/30 Floors
  • Expected possession date for Purva Northern Lights apartmentsPossession (Expected)
    Expected 2030 Onwards
  • Purva Northern Lights RERA approved project statusRERA
    PR/120326/008523

About Purva Northern Lights: A 24.55 acres Luxury Township in North Bangalore

Purva Northern Lights is a luxury residential township by Puravankara Limited in Bagalur, KIADB Aerospace Park, North Bangalore. The new launch of 2026 spans 24.55 acres. The project features 8 high-rise towers with 2973 premium 1, 2, 3, and 4 BHK units. With sizes from 408 to 2,400 sq. ft., Purva Northern Lights prices start from ₹1.11 Crores.

Northern Lights by Puravankara KVN is being developed in multiple phases with a Bali-inspired terraced landscape design.

Purva Northern Lights Phase 1 spans 9.5 acres and comprises 1,225 apartments across 3 high-rise towers. Northern Lights by Puravankara KVN Phase 2 covers 8.77 acres and offers 1208 units. Phase 3 spans 6.29 acres and includes 540 units.

Project Breakdown Phase 1 Phase 2 Phase 3
Total Land Area 9.5 acres 8.77 acres 6.29 acres
Tower Count 3 High-rise 3 High-rise 2 High-rise
Current Status New Launch 2026 Prelaunch Prelaunch
Configurations 1, 2, 3 & 4 BHK 1, 2, 3 & 4 BHK 2 & 3 BHK (Premium)
Total Inventory 1225 Units 1208 Units 540 Units
RERA Number PR/120326/008523 PR/120326/008524 PR/120326/008525

Purva Northern Lights - Project Highlights & Quick Facts

Feature Details
Developer Puravankara Limited
Project Name Purva Northern Lights
Project Type Luxury Integrated Residential Township
Total Land Area 24.55 acres of expansive greenery
Location KIADB Aerospace Park, Bagalur, North Bangalore
Key Landmarks Adjacent to Hardware Park, Shell Research Centre, and Aerospace SEZ
Connectivity 15 mins from Kempegowda International Airport; Near Doddajala Metro (Blue Line)
Total Units 2973 Premium Apartments
Architecture 8 High-Rise Towers with contemporary glass facades
Unit Variants 1, 2, 3 & 4 BHK Large-sized Luxury Residences
Starting Price ₹1.11 Crores* (Early-bird pricing for 2 BHK units)
RERA Status Fully RERA Approved
RERA No PR/120326/008523
Current Status New launch / Booking Open
Possession December 2029 (Targeted)

Expert Insight: The 2026 North Bangalore "Aerospace Edge"

"As of mid-March 2026, Purva Northern Lights is currently the most strategic 'buy' in North Bangalore. While others focus on Bagalur road-side projects, being inside the Aerospace Park places you at the doorstep of giants like Boeing and Airbus—creating a massive 'Rental Shield' for investors."

The Metro Multiplier: The Doddajala Metro Station (Blue Line) is nearing its late-2026 completion. Securing a unit now at the ₹1.11 Cr* pre-launch rate offers an estimated 15-18% capital appreciation before the metro even starts its commercial runs.
The "Bali" Lifestyle: Unlike high-density blocks, this 24.55-acre township dedicates 80% of its land to greenery. The 1 lakh sq. ft. dual-clubhouse ensures that it will command a premium rental yield of ~3.5%, significantly higher than the regional average.

Strategic Advisory: With 800+ allotments already secured in the first week of March, the 'Early-Bird' inventory for high-floor units with Nandi Hills views is depleting fast.

Key Highlights and Unique Selling Points

  • Massive 24.55 acres Integrated Township: As of March 2026, it is among the most luxurious upcoming apartments in North Bangalore. The 2026 Purva new project in Bangalore is within the KIADB Aerospace Park in Bagalur. Also, the largest township in North Bangalore in 2026.
  • Bali-Themed Sanctuary in the Heart of the Aerospace Hub: Defining the Future of North Bangalore in Devanahalli Growth Corridor with urban wellness. This Bali-inspired terraced landscape acts as a natural "lung" for the KIADB Aerospace Park. By incorporating multi-layered botanical zoning, the project addresses the urban heat island effect.
  • 80% Open Greenery & Sustainable Design: This largest township in North Bangalore in 2026 is a benchmark for low-density gated communities. These apartments near the Blue Line Metro are engineered to offer a "breath of fresh air" in a rapidly developing tech zone. By utilizing a peripheral tower alignment across a massive 24.55-acre expanse, the project maintains an 80% open-space ratio. This low-density footprint ensures maximum natural light and ventilation for every unit.
  • Active Wellness Trails: The Puravankara project in North Bangalore features over 2 kilometers of dedicated walking and jogging tracks, complemented by reflexology paths and forest fitness stations. This "Nature-First" engineering approach ensures that each luxury apartment, whether 1, 2, 3, or 4 BHK, serves as a private sanctuary. By avoiding "wall-to-wall" tower structures, the new Purva project in 2026, facilitates 270-degree cross-ventilation and provides unobstructed views of the North Bangalore skyline and the Nandi Hills corridor.
  • Grand 100,000+ sq. ft. Luxury Clubhouse: The project features an expansive, multi-level clubhouse with over 40+ curated amenities, including an infinity-edge pool, high-tech co-working zones, a dedicated pet park, and multi-sport courts designed for an active, high-end lifestyle.
  • Inside the KIADB Aerospace & Hardware SEZ: Located directly within the government-promoted 3,000-Acre KIADB Aerospace Park, the project offers a unique "walk-to-work" advantage. It is North Bangalore's premier industrial and technology corridor. 5,000+ high-value People looking for residential projects near Boeing India HQ, Airbus Technology Centre, and Shell R&D Campus in Bangalore have easy access. Residents here save 90% of their daily transit time. Being adjacent to Bangalore's most elite Aero-Hub corporate offices ensures lifestyle convenience, high rental demand and superior capital appreciation for investors.
  • Strategic "Airport Corridor" & Regional Connectivity: Situated off Bagalur Road at the NH 44 (Bellary Road) interchange, this project offers high-velocity, signal-free access to Kempegowda International Airport (BLR) in just 15 minutes. This Transit-Oriented Development (TOD) is strategically positioned near the Satellite Town Ring Road (STRR) and the Doddajala Metro Station (Blue Line), ensuring a frictionless 10-minute commute to Bangalore's arterial rail network. The convergence of these major infrastructure projects significantly accelerates capital appreciation and local real estate valuation. Residents enjoy rapid access to key economic hubs: Yelahanka (10 km, 20 mins), Devanahalli (14 km, 20 mins), Manyata Tech Park (16 km, 25 mins), and the Hebbal Flyover (18 km, 30 mins).
  • The "Puravankara" Legacy of Excellence: With over 50 years of expertise, the Puravankara brand delivers on time and offers superior build quality. Purva properties in Bangalore have historically experienced higher capital appreciation and rental yields (8-10%) due to their "WorldHome" design philosophy and premium finishes.
  • North Bangalore Growth Frontier: Bagalur is the "New North" and the next major growth engine after Whitefield. With the massive expansion of the Aerospace SEZ and the upcoming Metro Phase 2B (Airport Line), property values in this specific pocket is among the highest in Bangalore real estate 2026. It is projected to appreciate aggressively each year as the SEZ nears full operational capacity.
  • NH 44 Capital Appreciation Trends: The Bellary Road corridor (NH 44) has emerged as North Bangalore’s primary 'growth artery,' with property values in micro-markets like Hebbal and Yelahanka appreciating by 8–12% annually. This surge is underpinned by the ₹16,000 crore airport expansion and the upcoming Metro Blue Line (Phase 2B), which is projected to drive a further 10–15% premium for properties within a 2km radius of stations. This robust infrastructure pipeline, combined with high demand for Grade-A commercial spaces, ensures North Bangalore remains a top-tier destination for long-term capital gains.
  • Strategic Rental Yields in the Aerospace Corridor: The project’s location within the 3,000-acre KIADB Aerospace Park creates a high-barrier-to-entry rental market. With global giants like Boeing, Airbus, and Shell establishing massive R&D hubs here, there is a consistent influx of high-net-worth individuals and expatriates. This concentration of 'Fortune 500' talent, combined with the proximity to Kempegowda International Airport, drives a projected 8–10% rental yield, significantly outperforming traditional residential micro-markets in Bangalore.

Expert Analysis: The "Aerospace Advantage" in 2026

"As of March 17, 2026, Purva Northern Lights has emerged as the value leader in North Bangalore. While Hebbal reaches price saturation, this project inside the KIADB Aerospace Park offers a 'Pre-launch Alpha' that most buyers are missing."

The "Walk-to-Work" Reality:

This isn't just a home; it's a strategic asset located literally steps from Boeing's India HQ and the Airbus Technology Centre. In a city where traffic is the #1 complaint, residents here are reclaiming 2 hours of their day. This proximity is projected to drive a 20% rental premium and a 95%+ occupancy rate from high-net-worth expat tenants.

Strategic Update: With the Doddajala Metro (Blue Line) nearing its late-2026 test runs, the current ₹11,000/sq.ft. entry point is expected to hit ₹12,500/sq.ft. by the Q3 2026 phase release.

Purva Northern Lights Comparison with Purva North Bangalore Projects in 2026

Feature Purva Northern Lights Purva Celestial Purva Palm Beach Purva Atmosphere
Location KIADB Aerospace Park, Bagalur Hosahalli, Airport Road Hennur Main Road Thanisandra Main Road
Core Theme Integrated High-Tech Township BluNex Smart Living Tropical Beach Resort WorldHome / Air Wellness
Current Status New Launch 2026 Under Construction Ready to Move Ready to Move
Possession Dec 2029 – Dec 2030 June 2027 Immediate (OC Received) Ready (Early 2026)
Land Parcel ~24.55 acres ~10 Acres ~19.37 Acres ~13 Acres
Configurations 1, 2, 3 & 4 BHK 2 & 3 BHK 2 & 3 BHK 2, 3 & 4 BHK
Starting Price ₹0.80 Cr* ₹1.05 Cr* ₹1.19 Cr* ₹2.00 Cr*
Key Amenity 1 Lakh sq. ft. Mega Clubhouse Oxygenated Clubhouse 4-Acre Lagoon & Wave Pool 34th Floor "Sky Club"

2026 Portfolio Strategy: Which "Purva" is Your Move?

"In the current March 2026 market, Purva Northern Lights is the 'Wealth Builder,' while Purva Atmosphere is the 'Status Symbol.' The price gap of nearly ₹1.2 Cr between these two projects reflects the maturity of Thanisandra vs. the explosive potential of Bagalur."

Investor Type Expert Recommendation
The "Growth" Investor Choose Northern Lights. Buying at ₹11,000/sq.ft inside the SEZ before the 2026 Blue Line Metro test runs is the best play for 15% annual capital gains.
The Tech Professional Choose Purva Celestial. It hits the "sweet spot" with a June 2027 possession, allowing you to move in just as the Airport Road infrastructure reaches full completion.
The Lifestyle Buyer Choose Purva Atmosphere. With the 34th-floor Sky Club and "Air Wellness" features ready for move-in, this remains the gold standard for high-altitude luxury in Thanisandra.

Market Note: Purva Palm Beach units are now primarily available in the resale market. Due to its unique 4-acre lagoon, these units currently fetch a 15-20% rental premium over standard apartments in Hennur.

About The Location

A premium gated community near Bangalore Airport, Purva is a high-yield returns project. Prices start at ₹1.11 Crores for a 2 BHK apartment. Currently in the new launch stage, RERA no PR/120326/008523 was approved on 12th March 2026. Recognized as one of the most searched new launch projects in North Bangalore in 2026, the project is positioned to absorb the significant demand for luxury apartments in Aerospace Park, Bagalur Road, and KIADB Hardware Park. Rapid infrastructure growth, such as the Phase 2B Blue Line Metro and airport corridor development, is transforming the micro-market into a primary residential hub for the 50,000+ professionals at nearby global firms like Boeing and Airbus.

A Legacy of Excellence by Puravankara Limited: As a flagship township by an A-Grade developer with a 45-year track record, Purva Northern Lights (Purva Codename Flow) sets the gold standard for luxury flats on Bagalur Road. This RERA-compliant investment is strategically designed to meet the high demand within the KIADB Aerospace Park corridor. Whether you are seeking a luxury 2 BHK near Bangalore Airport for high rental yields or a 3/4 BHK family sanctuary, this development offers the perfect blend of institutional security and exponential capital appreciation.

The Purva Northern Lights Location is inside KIADB Aerospace Park, Bagalur Road, (Near Hardware Park, off Bellary Road/NH 44, in North Bangalore, Karnataka - PINCODE: 562149). It is 10 mins from the Doddajala Metro Station(upcoming Airport Metro Blue Line) and close to the Shell R&D Centre (5 mins) and the Boeing India HQ (8 mins).

The Satellite Town Ring Road (STRR), which is 7 minutes (6.2 km) away, provides great connectivity to Hebbal, Yelahanka, Devanahalli, and Central Bangalore. Just 10 Minutes (10 km) from NH 44, a major North-South Highway, which is the longest National highway in the country.

The Northern Lights location adds strong value to the Puravankara new residential project near the International Airport (KIAL), placing you at the center of North Bangalore's emerging tech and aerospace corridor. Bagalur Road connects seamlessly to major IT parks, corporate offices, and social hubs, making it an ideal choice for those looking for luxury apartments near Devanahalli.

  • 32-Meter-Wide KIADB Road: Offers seamless movement within the hub with easy access to NH 44 and the upcoming Peripheral Ring Road (PRR).
  • Vital Link via Bagalur Road: A crucial corridor connecting Yelahanka, Kattigenahalli, Sathnur, and Hennur.
  • Enhanced Highway Access: Significantly improves reach to NH 44 (Bellary Road)/ and the Hennur-Bagalur Road, streamlining the commute to the Bangalore Airport.
  • Proximity to Tech Hubs: A prime choice for professionals seeking apartments near Manyata Tech Park or those looking for premium flats near Bangalore Airport.

This gated community flats near Manyata Tech Park (15 km, 25 minutes) is also close to Bhartiya City (12 km, 20 minutes) and the Kirloskar Tech Park (18 km, 30 minutes) in North Bangalore. It is a prime spot with great connectivity and a fast-growing neighborhood driven by the Aerospace SEZ.

Doddajala Metro Station on the Namma Metro Blue Line (Airport Line) is just 10 minutes away. A major advantage is that the upcoming Metro Phase 2B (Airport Line) will be a game-changer, connecting the city center to the airport with stops near the aerospace hub.

It will bring high-speed transit within minutes of the project. The Kempegowda International Airport (KIAL) is about 12 km (15 mins) from the best luxury projects in Bagalur 2026. It is about a 15-minute drive via the Aerospace Park main road, providing the fastest airport access for frequent travelers and expatriates.

The best luxury apartments near Bangalore Airport offer excellent access to Key Transport Hubs, including Yelahanka Railway Station, approximately 12 km (~20–25 min) from the township.

Puravankara's new KIADB North Bangalore pre-launch venture, Northern Lights, is among the largest luxury townships planned for 2026 in the Aerospace Park region. The project is designed with 80% open and green spaces and features a 1 lakh sq. ft. mega clubhouse equipped with premium lifestyle amenities.

Puravankara's new 2026 project in North Bangalore, Purva Northern Lights KIADB Aerospace Park, features apartment prices starting at ₹1.11 Crores for a 2 BHK unit and rising to ₹2.64 Crores for a 4 BHK unit.

📍 2026 Location Intelligence: The "15-Minute" Advantage

"In the North Bangalore of 2026, proximity isn't measured in kilometers, it's measured in Signal-Free Minutes. While Hebbal residents fight 45-minute commutes, Purva Northern Lights residents are reaching the International Airport in 15 minutes and Boeing HQ in under 8."

Why the 12th March RERA Approval is a Game-Changer:

The official certification has unlocked the 'Early-Bird' price shield. At ₹1.11 Cr*, you are entering the KIADB corridor at a 25% discount compared to the upcoming 2027 'Ready-to-Move' valuations. With the Doddajala Metro (Blue Line) test runs starting later this year, this micro-market is entering its final window of high-yield entry.

Expert Insight: The 32-Meter-Wide KIADB internal roads provide the best "Walk-to-Work" ecosystem in Bangalore today, specifically designed for the 50,000+ C-suite professionals at Shell, Airbus, and Boeing.

Type Of Apartment

Purva's new launch includes 2973 premium high-rise residences. It offers 1, 2, 3, & 4 BHK flats. Are you searching for a property in North Bangalore under 2 crores? That means you have two options below, each with 3 types.

  • 1 BHK Apartments: 408 sq. ft., these units offer an compact living experience for professionals seeking 1 BHK flats near Bangalore Airport.
  • 2 BHK Apartments: Ranging from 1097 – 1437 sq. ft., these units offer an optimized living experience for professionals seeking 2 BHK flats near Bangalore Airport.
  • 3 BHK Apartments: With expansive layouts from 1686 – 2178 sq. ft., these are the definitive 3 BHK luxury apartments in North Bangalore 2026 for growing families.
  • 4 BHK Apartments: Spanning 4017 – 4131 sq. ft., these palatial residences set the standard for ultra-luxury flats in Aerospace Park for elite buyers.

Purva Northern Lights Dates: Official Project Milestones

  • Exclusive Pre-Launch Date: 10 March 2026
  • Official Launch Date: 12 March 2026
  • Projected Completion Time: 4 Years
  • Target Completion Date: 31 December 2029
  • Target Possession Date: 15 January 2030

Reviews, Ratings, and Brochure

Purva Northern Lights reviews have been very positive, with an average rating of 4.7/5. Buyers consider this project an excellent choice for living in the vibrant locality of KIADB Hardware Park, thanks to its modern amenities, strong connectivity to the airport corridor, futuristic township planning, and expansive open spaces. The project is expected to rank among the top 5 luxury apartment launches in Bangalore in 2026.

A premier landmark in the airport corridor within KIADB Aerospace Park, it is a major driver for high rental yields and capital appreciation. Combining a futuristic smart home lifestyle with 80% open spaces, this gated community is widely considered one of the safest and best property investments in North Bangalore for IT professionals and NRI investors.

Purva Northern Lights RERA No: PRM/KA/RERA/1251/309/PR/120326/008523

The project is officially registered with Karnataka RERA. Formal approval was granted on March 12, 2026. All critical clearances from KIADB, BDA, and BBMP are fully secured, ensuring a transparent, compliant, and high-security investment environment for all homeowners.

As fully RERA-approved landmark properties, these luxury apartments in Aerospace Park stand as the gold standard for compliant, secure real estate investments in North Bangalore in 2026.

EOI Payment and Bank Details

The Expression of Interest (EOI) for Purva Northern Lights will begin on 10 March 2026. EOI holders will receive priority unit allocation along with special pre-launch pricing benefits.

A post-dated cheque (PDC) must be submitted in the name of Puravankara Limited, and priority allotment will be given to EOI customers. Pre-launch bookings will officially open in March 2026.

  • EOI Amount: ₹1 Lakh (Refundable PDC) for all apartment types

EOI Benefits:

  • Priority Unit Allocation
  • Pre-Launch Price Advantage

Payment Plan Structure

Purva Northern Lights follows a construction-linked payment plan, which allows buyers to pay in stages based on the project’s progress. This makes the payment process easier and more manageable.

The payment plan is structured as follows:

  • 10% payable at the time of apartment allotment
  • 10% payable at the time of agreement signing (within 60 days)
  • The remaining 80% is payable in stages linked to construction progress, spread over the next 4 years

Puravankara Group – News Update (2026)

Puravankara Limited is regarded as one of the India's best real estate company. The group has earned strong buyer trust by delivering 80+ projects across 13 major cities, including Bangalore, Hyderabad, Chennai, Kochi, and Goa. Currently, 60 projects spanning over 25 million sq ft are in the development pipeline.

Historical Growth of Bagalur & North Bangalore

Before its emergence as a global tech and aviation powerhouse, the Bagalur corridor was a serene agrarian pocket on the outskirts of Bangalore. The transformation began in earnest with the inauguration of Kempegowda International Airport, which acted as a catalyst for the surrounding 3,000-acre KIADB Aerospace & Hardware Park.

Over the last decade, the area has evolved from a "future destination" into a bustling economic hub. The arrival of global giants like Shell, Boeing, and Airbus, combined with the development of the STRR (Satellite Town Ring Road) and the upcoming Metro Blue Line, has turned this region into Bangalore's most sought-after investment zone for 2026 and beyond.


Master plan overview of Purva Northern Lights luxury apartments in Bagalur

The Concept: Why "Northern Lights"?

The name Purva Northern Lights is inspired by the celestial phenomenon of the Aurora Borealis—symbolizing brilliance, rare beauty, and a life illuminated by luxury. Located in the booming "North," the project is designed with expansive glass facades and open-plan layouts to maximize natural light and offer a serene, resort-style atmosphere.

Official Project Bulletin: Purva Northern Lights

Verified Updates & Compliance Reporting | Last Updated:


Inaugurating a New Era of Luxury

Sacred Bhoomi Puja & Commencement Ceremony

Grand Unveiling: Flagship Experience Centre

PURVA NORTHERN LIGHTS

📅 Wednesday, 18th March 2026
08:30 AM | Auspicious Commencement (Luncheon to Follow)
📍 KIADB Aerospace & Hardware Park, Bagalur, North Bengaluru

  • Regulatory Compliance: RERA Certification successfully secured as of March 12, 2026. This milestone ensures full legal transparency and adherence to all Karnataka Real Estate Regulatory Authority mandates.
  • Market Absorption: High-velocity demand recorded with 800+ allotments finalized within the initial 72-hour Expression of Interest (EOI) window, reflecting strong investor confidence.
  • Construction & Operational Readiness: Full-scale site mobilization is complete; civil engineering and foundation work for Phase 1 (Towers 1–3) is programmed to commence by mid-April 2026.
  • Precision Experience Units: Fully realized 2, 3, & 4 BHK Signature Model Residences are now open for technical walkthroughs at the Bagalur Site Experience Centre (10:00–18:00 IST daily).

Secure your residence at the Institutional Founding Rate prior to the scheduled Q2 2026 market price adjustment. This window offers a calculated entry point into the high-growth KIADB Aerospace corridor.

  • Asset Valuation: Starting at ₹0.80 Cr* (Optimized entry-pricing for high-liquidity 1 BHK layouts).
  • Priority Inventory: Direct access to premium park-facing and high-altitude Vaastu-synchronized units for early-stage investors.
  • Fiduciary Benefit: Guaranteed priority allotment for registered **EOI (Expression of Interest)** holders, ensuring optimal unit selection before public launch.

As of March 12, 2026, Purva Northern Lights has officially received its RERA registration number: PRM/KA/RERA/1251/309/PR/120326/008523. This certification ensures adherence to transparency and construction timelines mandated by the Karnataka RERA portal.

The newly developed site office at KIADB Aerospace Park is now open. Prospective buyers can visit to view the detailed 3D model of the 24.55-acre township layout and interact with certified Relationship Managers.

Our fully-furnished model apartments (Sample Flats) are now open for technical walkthroughs. Experience the design quality and material specifications of our 1, 2, 3, and 4 BHK luxury residences firsthand.

  • Architecture: Deep-dive into 1, 2, 3, and 4 BHK layouts.
  • Facility Inspection: On-site reviews of the 100,000 sq. ft. clubhouse footprint.
  • Hours: Daily tours from 10:00 AM – 6:00 PM led by certified Relationship Managers.

High-velocity absorption continues with over 800 families already securing their interests. The formal disclosure event is scheduled for March 14, 2026, at The Leela Palace, Bengaluru.

Expert Advisory: With the official price lock set for March 25, 2026, current entry points starting at ₹1.11 Cr represent the final pre-launch valuation. Given the high EOI (Expression of Interest) volume, we recommend finalizing documentation today to benefit from "Launch Week" price protection.

Apartment Types & Price Table

The pre-launch price of Purva Northern Lights is approximately ₹11,000 per sq ft. The overall price range starts from ₹1.11 Cr onwards and can go up to ₹2.64 Cr onwards, depending on the unit type, floor rise, view, and launch offers.

Unit Type Size Range Price Range
1 BHK 408 sq ft ₹0.80 Cr Onwards
2 BHK 1,097 – 1,428 sq ft ₹1.11 Cr Onwards
3 BHK 1,736 – 2,178 sq ft ₹1.9 Cr* Onwards
4 BHK 4,017 – 4,131 sq ft ₹2.64 Cr Onwards

* Final pricing may vary based on floor rise, tower location, unit facing, and applicable launch offers.

Costsheet, Payment Plan & Offers



Easily estimate your monthly home loan payments for this Purva Bagalur Road new launch housing project by Puravankara Limited, Purva Northern Lights in Bangalore, using our EMI Calculator. Just enter your loan amount, annual interest rate, and loan tenure to plan your budget.


Floor Plans

The Purva Northern Lights floor plans include well-designed 2 BHK, 3 BHK, and 4 BHK apartments, with sizes ranging from 408 sq. ft. to 4131 sq. ft.. Each layout is planned to maximise natural light, cross-ventilation, privacy, and functional living spaces.

Purva Northern Lights 2 BHK 2T Comfort 1097 Sq Ft
Purva Northern Lights 2 BHK 2T Comfort 1104 Sq Ft
Purva Northern Lights 2 BHK 2T Grand 1275 Sq Ft

Purva Northern Lights 2 BHK 2T Grand Corner 1326 Sq Ft
Purva Northern Lights 2 BHK 2T Grand Corner 1336 Sq Ft
Purva Northern Lights 3 BHK 3T Grand 1736 Sq Ft

Purva Northern Lights 3 BHK 3T Grand 1728 Sq Ft EWS 130 Sq Ft
Purva Northern Lights 3 BHK 3T Uber 1886 Sq Ft EWS 145 Sq Ft
Purva Northern Lights 3 BHK 3T Grand Corner 1686 Sq Ft

Purva Northern Lights 3 BHK 3T Grand Study 1962 Sq Ft
Purva Northern Lights 4 BHK Grand Duplex Lower 4017 Sq Ft
Purva Northern Lights 4 BHK Grand Duplex Upper 4017 Sq Ft

Purva Northern Lights Inventory

Sl No. Type of Inventory Units Carpet Area (Sq Mtr) Balcony/Verandah (Sq Mtr)
1 EWS 100 745 0
2 1 BHK 202 7,659 0
3 2 BHK 535 35,299 3,738
4 3 BHK 372 37,013 3,014
5 4 BHK 16 3,399 476
TOTAL 1,225 84,115 7,228

Apartment Configurations at Purva Northern Lights

  • 1 BHK Apartments – Cosy and comfortable homes designed for bachelors and single professionals.
  • 2 BHK Apartments – Compact yet comfortable layouts suitable for small families.
  • 3 BHK Flats in North Bangalore – Well-planned homes ideal for medium-sized families with modern layouts.
  • 4 BHK Luxury Flats in Bangalore – Spacious luxury residences designed for large families seeking premium living.

The apartment sizes in this township range from 408 sq. ft. to 4,131 sq. ft.. These homes also include co-working spaces, making them suitable for modern work-from-home lifestyles. The project provides affordable apartments near KIADB Aerospace, making it attractive for professionals working in nearby industrial and technology hubs.

Apartments in the KIADB Industrial Area Near Bangalore Airport

A 1, 2, 3, and 4 BHK apartment in the KIADB industrial area near Bangalore Airport offers the advantage of living in a modern, multi-storey residential development with managed facilities. Apartments are highly popular in North Bangalore because they provide gated community living, professional maintenance, and shared lifestyle amenities such as parks, clubhouses, and sports facilities.

Residential projects located close to Kempegowda International Airport consistently see strong demand due to their connectivity, infrastructure growth, and proximity to major employment hubs.

The Purva Northern Lights project is planned with premium 1, 2, 3, and 4 BHK iconic apartments in the KIADB Aerospace & Hardware Park corridor. This upcoming township project in Bangalore is strategically located near major IT hubs including Manyata Tech Park, Kirloskar Tech Park, and Bhartiya City Tech Park, along with access to schools, hospitals, and shopping areas.

Core Design Philosophy: Vastu and Efficient Space Utilization

A key highlight of this 24.55-acre Puravankara gated community township is its focus on Vaastu-compliant planning. Each apartment is designed to encourage positive energy flow with East- and West-facing entrances, well-positioned kitchens, and bedrooms aligned according to Vaastu principles.

The design also prioritizes maximum space utilization. Long corridors and unused corners are minimized to ensure that every square foot is functional and usable. When comparing Carpet Area vs. Super Built-up Area (SBA), Purva Northern Lights KIADB maintains a high 70–75% usable internal area, offering buyers better value for their investment.

Best Units for End-Use Buyers

For families planning to move into a property near KIADB Aerospace SEZ by 2029, higher-floor apartments can be a suitable option. These units typically offer:

  • Unobstructed views of the open green spaces within the township
  • Reduced noise levels for a quieter living environment
  • A luxury, resort-style lifestyle within a high-rise community

1 BHK Floor Plan

SBA: 408 sq. ft.

Rooms Layout:

A compact and efficient layout that includes a living-dining area, one bedroom, a kitchen with utility space, and one bathroom.

Ideal For:

Single professionals, young couples, or investors targeting rental demand near Manyata Tech Park and surrounding IT corridors.

2 BHK Floor Plan

SBA: 1,097 to 1,428 sq. ft.

Rooms Layout:

A smart and compact design featuring a foyer, living-dining area, and two bedrooms with attached bathrooms.

Balconies:

2 balconies – one attached to the living area and one utility balcony connected to the kitchen.

Ideal For:

Small families, young professionals working in Manyata Tech Park or nearby employment hubs. It is also suitable for retirees seeking low-maintenance luxury living.

3 BHK Floor Plan

SBA: 1,736 to 2,178 sq. ft.

Rooms Layout:

Three well-planned bedrooms including a large master suite, along with a living-dining area and utility space.

Balconies:

A wide balcony connected to the living room and a private balcony for the master bedroom.

Ideal For:

Medium-sized families seeking luxury flats near Hebbal that provide comfort, space, and good natural ventilation.

4 BHK Floor Plan

SBA: 4,017 – 4,131 sq. ft.

Rooms Layout:

Four large bedrooms, a grand foyer, spacious living-dining hall, and a servant’s room with a separate entrance.

Balconies:

3 to 4 balconies including a deck-style main balcony, private master balcony, and utility balcony.

Ideal For:

Large or multi-generational families, executives, and luxury homebuyers looking for a “villa-in-the-sky” living experience near Airport Road, Bangalore.

Model Apartments: Experience Your Future Home

Model apartments will be available at the Purva Northern Lights site during the official launch. Prospective buyers will be able to:

  • Walk through 1, 2, 3, and 4 BHK units to understand layouts and space planning
  • Inspect premium finishes such as vitrified flooring, branded sanitary ware, and modern kitchen fittings
  • Experience the natural ventilation and sunlight that highlight the airy design of the towers

Master Plan

The Purva Northern Lights master plan is spread across 24.55 acres and features 8 high-rise towers with B + G + 29/30 floors. The township is designed with wide internal roads, landscaped open spaces, and clearly zoned residential and amenity areas.

The project includes:

  • 8 high-rise towers housing 2,973 ultra-luxury apartments
  • 80% open and landscaped green spaces across the development
  • A 1 lakh sq. ft. clubhouse featuring 80+ premium amenities including swimming pools, gyms, co-working spaces, and sports courts
  • 7.3 acres of central podium space designed for community recreation and leisure
  • Wide internal roads, landscaped parks, and dedicated kids' play areas
  • A 76,000 sq. ft. retail boulevard within the township

This master plan is designed to deliver a premium high-rise apartment lifestyle in Bangalore, while maintaining a healthy, open, and green residential environment in North Bangalore.

Design Inspiration and Living Environment

The planning concept of the project is inspired by Bali’s terraced landscapes, creating a living environment where nature is integrated throughout the community. The terraced design enhances the visual openness of the development while ensuring that homes receive abundant natural light and cross ventilation.

This design approach helps create a calm and balanced residential atmosphere, allowing residents to enjoy modern urban living within a thoughtfully planned township that reflects the concept of “Homes Choreographed by Nature.”

Purva Northern Lights Master Plan Layout

Purva Northern Lights: Master Plan & Zone Identification

Zone Number Feature / Amenity Description
01 Main Entrance & Plaza Grand gated entry from Bagalur Main Road with a multi-tier security kiosk and a welcoming landscaped arrival plaza.
02 The Grand Clubhouse A massive 1,00,000 sq. ft. luxury hub featuring a business lounge, co-working zones, a cafe, and a multi-level fitness center.
03 Aquatic Zone Features an Infinity-Edge swimming pool, a separate temperature-controlled indoor pool, and a dedicated kids' splash pool with a sundeck.
04 Residential Skyscrapers 8 Iconic High-Rise Towers reaching B+G+30/31 floors, designed with 80% open space to ensure panoramic views and cross-ventilation.
05 Sports & Action Hub Professional-grade Tennis and Basketball courts, outdoor Badminton, Cricket practice nets, and a dedicated Rock Climbing wall.
06 The Wellness Forest Landscaped gardens with Miyawaki forest pockets, yoga/meditation studios, and an elevated 1km jogging/cycling track.
07 Leisure & Social Zone An Open-Air Theatre (OAT), party lawns, BBQ pits, and a "Hammock Corner" for weekend relaxation.
08 Kids & Pets Park Specialized play zones with sandpits and climbing frames, alongside a dedicated Pet Park with grooming and agility stations.

Towers and Blocks – Key Plan Features of Purva Northern Lights

The tower placement and internal layout of Purva Northern Lights are planned to ensure efficient circulation, open views, and easy access to amenities. The development follows a structured layout that balances residential towers with landscaped spaces and community facilities.

Entry and Exit Gates

Main Entrance:
The primary entrance is a wide access point from the KIADB Aerospace Park main road, allowing smooth entry for residents and visitors.

Highway Access:
The project is located a few minutes from NH 44 (Bellary Road), which provides convenient connectivity to other parts of Bangalore.

Secondary Exit:
A separate exit road is planned to help manage traffic flow during peak hours and reduce congestion within the township.

Tower Placement and Layout

Smart Layout:
The eight residential towers are strategically positioned along the boundary of the project land.

Open Central Zone:
The central area of the township is kept open and designed with landscaped gardens and parks.

Better Views:
This layout ensures that most apartments overlook greenery or open spaces, enhancing the overall living experience.

Structure:
All towers are designed as high-rise residential buildings with basement parking and modern lobby areas.

Clubhouse Location

Central Position:
The clubhouse is located at the center of the development, making it easily accessible from all residential towers.

Near Sports Zone:
Outdoor sports facilities are placed close to the clubhouse, allowing residents convenient access to both indoor and outdoor recreational areas.

Open Space Planning

80% Open Area:
Only a limited portion of the land is used for residential structures, while the majority is reserved for open and landscaped spaces.

Green Environment:
Large parks, landscaped gardens, and tree-lined spaces create a fresh and airy atmosphere within the township.

Parking Layout

Basement Parking:
Most of the parking is planned underground, which helps keep the ground level open for landscaping and pedestrian areas.

Visitor Parking:
Dedicated visitor parking spaces are located near the entrance for convenience.

EV Charging:
Provision for electric vehicle charging points will be available for residents.

Internal Roads and Pathways

Vehicle-Free Zones:
Several pedestrian areas are designed to be safe walking zones for children and senior residents.

Wide Internal Roads:
The internal road network is designed to allow smooth vehicle movement, including access for emergency services.

Jogging Track:
A dedicated jogging and cycling path runs through the landscaped areas of the township.

Safe Drop-Off Points:
Each residential tower includes designated entry and drop-off zones for residents and visitors.

Latest Construction Status in Purva Northern Lights - March 2026

Construction preparation activities are progressing at Purva Northern Lights. The developer is currently completing early-stage site preparation works required before major construction begins. The project follows the design theme “Choreographed by Nature.”

Current Site Activities

  • Digging & Leveling: Initial ground excavation has started and soil leveling work is underway to prepare the site for structural construction.
  • New Site Office: An on-site office is being developed where visitors will be able to view a 3D model of the overall township layout.
  • Model Homes: Sample apartments are nearing completion. These model homes will allow prospective buyers to experience the layout, finishes, and design quality of the residences.

Project Timeline

The following schedule outlines the planned construction stages for Purva Northern Lights. These milestones provide an overview of the development timeline from site preparation to structural completion.

Phase 1: Foundation and Structural Base

Work Type Starts Ends
Ground Leveling April 2026 Sept 2026
Foundation Work Aug 2026 March 2027
Basement & Parking Jan 2027 July 2027
Ground Floor Level Nov 2026 Nov 2027

Phase 2: Structural and Interior Development

Work Type Starts Ends
Main Building Frame Feb 2027 Nov 2027
Walls & Brickwork Feb 2027 Nov 2029
Plastering & Painting Feb 2027 Dec 2029
Flooring & Tiles Nov 2027 Oct 2029
Windows & Doors July 2027 Sept 2029
Wiring & Plumbing April 2028 Dec 2029

Visit the Sales Office

Prospective buyers can visit the on-site sales office to review the latest construction updates, view project plans, and understand the development schedule. The sales team can also provide detailed information about apartment layouts, amenities, and the overall township plan.


Location & Connectivity

Purva Northern Lights Location – KIADB Aerospace Park, Bagalur

Purva Northern Lights is located inside the KIADB Aerospace Park / Hardware Park, Bagaluru, North Bangalore. This is a government-promoted aerospace and high-tech corridor with strong infrastructure growth, employment generation, and premium residential demand.

  • Micro-market: Bagalur – North Bangalore (Airport growth corridor)
  • Employment proximity: Aerospace / Defence / IT ecosystem
  • Key roads: NH 44, SH 104, upcoming PRR connectivity
  • Metro advantage: Upcoming Airport Metro (Phase 2B – Blue Line)


Purva Northern Lights location map

Project Address

Purva Northern Lights,
KIADB Aerospace Park / Hardware Park,
Bagaluru, North Bangalore,
Bengaluru, Karnataka – 562149

Landmark & Map Details

Landmark: Near Boeing India & Shell Campus
Coordinates: 13.12° N, 77.70° E
Google Plus Code: 7J4V+GV, Bengaluru, Karnataka

Explore Near By School, hospital, malls, employment Zone

Location Advantages of Purva Northern Lights

Location plays a critical role in long-term property value. Bagaluru has emerged as a high-growth micro-market in North Bangalore due to rapid infrastructure development, strong demand from the airport corridor, and proximity to industrial & business hubs. This makes it ideal for both end-users and investors.

Connectivity Snapshot

Key Infrastructure Distance / Travel Time
Kempegowda International Airport (BIAL) 10 km | 15 mins*
Yelahanka Railway Station 12 km | 20 mins*
Upcoming Metro Station Doddajala Station (Nearest upcoming hub)
Manyata Tech Park 15 km | 25 mins*

* Travel time may vary based on traffic and route conditions.

Investment Potential of Purva Northern Lights Near Bangalore Airport

Purva Northern Lights is considered a promising property investment near Bangalore Airport because of its strong location advantages. The project benefits from airport connectivity, upcoming metro access, highway connectivity, and proximity to major IT parks, making it suitable for both residential living and long-term investment in North Bangalore.

Connectivity to Purva Northern Lights

The project is located within KIADB Aerospace Park in North Bangalore, a developing corridor known for its improving infrastructure and road network. The area has convenient access to the airport and nearby employment hubs, which is one of the reasons many homebuyers and investors consider this location for long-term residential investment.

Airport Connectivity

Kempegowda International Airport is located close to the project, providing convenient travel for frequent flyers.

  • Distance: Around 10 km
  • Travel Time: Approximately 15–20 minutes by car via NH 44, depending on traffic conditions
  • Public Transport: Airport taxis, app-based cabs, and BMTC airport buses (Vayu Vajra) are available

This connectivity makes the location practical for residents who travel regularly for work or business.

Metro Connectivity

The upcoming Namma Metro Blue Line (Airport Line) is expected to enhance public transportation in this area.

  • Nearest Upcoming Station: Doddajala Metro Station
  • Distance: Around 2–3 km from the project
  • Other Upcoming Station: Bagalur Aerospace Park Metro Station

Once operational, the Airport Metro Line will connect North Bangalore with several major parts of the city.

Bus and Public Transport

Public transport in the area is supported by BMTC bus services that operate along Aerospace Park and Bagalur Road.

  • Regular buses connect the area to Yelahanka and Hebbal
  • App-based taxi services are available throughout the day
  • Travel time to Hebbal: Around 30–35 minutes depending on traffic

Road Connectivity

Road connectivity is one of the main advantages of this location, providing access to key areas of the city.

Important Road Links

The location of Purva Northern Lights benefits from access to several important road networks that support smooth travel to major parts of Bangalore and nearby regions. :contentReference[oaicite:0]{index=0}

  • NH 44 (Bellary Road): Connects Hebbal to Kempegowda International Airport and extends toward Hyderabad.
  • Bagalur Main Road / SH 104: Provides connectivity toward Yelahanka and the KR Puram corridor.
  • Satellite Town Ring Road (STRR): Improves regional connectivity to Doddaballapur, Hoskote, and nearby areas.
  • Outer Ring Road (via Hebbal): Connects the location to Manyata Tech Park and the East Bangalore IT corridor.

Upcoming Infrastructure Improvements

Several infrastructure developments are expected to further enhance connectivity in this corridor: :contentReference[oaicite:1]{index=1}

  • Completion of the Namma Metro Blue Line (Airport Line)
  • STRR expansion to improve regional travel
  • Road upgrades around the KIADB Aerospace Park
  • Continued infrastructure development in the Devanahalli–Bagalur corridor

Overall, the location already benefits from strong highway and airport connectivity. Future developments such as the metro line completion and planned infrastructure upgrades are expected to further strengthen accessibility in this part of North Bangalore.

These road networks help residents travel conveniently to the airport, IT parks, and other important areas of Bangalore.

Comparison Factor Hebbal Bagalur / Aerospace Park
Market Phase Mature / Developed Emerging / High-Growth
Average Price (2026) ₹11,000+ per sq. ft. ₹7,000 – ₹8,500 per sq. ft.
Open Space Availability Limited Large land parcels and township developments
Best Suited For Stable rental income Long-term appreciation

Top 6 Reasons to Choose Bagalur / Aerospace Park for Investment

1. Airport & Aerospace Growth Corridor

Purva Northern Lights is located within KIADB Aerospace Park, part of the larger Devanahalli–Bagalur growth corridor near Kempegowda International Airport. This region has emerged as one of the most important development zones in North Bangalore.

  • The airport handles 35+ million passengers annually, making it one of India’s busiest airports.
  • The Aerospace SEZ & Hardware Park hosts companies including Boeing suppliers, Airbus ecosystem partners, and other global aerospace firms.
  • Large-scale commercial development is planned around Devanahalli Business Park.

Unlike central Bangalore markets, this micro-market is primarily driven by airport, logistics, and aerospace sector employment.

2. Structured Price Gap Advantage (Hebbal vs Bagalur)

North Bangalore shows a clear price difference between mature locations and emerging corridors.

  • Hebbal average prices (2026): ₹11,000 – ₹14,000 per sq. ft.
  • Bagalur / Aerospace Park (2026): ₹7,000 – ₹8,500 per sq. ft.

This price difference creates a potential catch-up growth opportunity as infrastructure projects are completed, subject to market conditions.

Between 2020 and 2026, North Bangalore has seen steady appreciation supported by:

  • Airport expansion
  • Satellite Town Ring Road (STRR)
  • Namma Metro Blue Line (Airport Line)

3. Employment Density within a 20–25 km Radius

This corridor benefits from several established employment hubs.

  • Manyata Tech Park – One of Bangalore’s largest IT hubs
  • Kirloskar Business Park – Major corporate offices
  • KIADB Aerospace SEZ – Aviation and manufacturing sector hub
  • Bhartiya City – Mixed-use technology and residential township

These employment centres support consistent housing demand from working professionals.

4. Strategic 20–30 Minute Connectivity Grid

The project is positioned within North Bangalore’s developing transport network.

  • 15–20 minutes to Kempegowda International Airport via NH 44
  • 25–35 minutes to Hebbal Flyover
  • 30–35 minutes to Manyata Tech Park
  • Upcoming Blue Line Metro stations at Doddajala and Aerospace Park

NH 44 provides wide multi-lane highway connectivity compared to smaller internal roads in older city areas.

5. Rental Demand Supported by Employment

Rental demand in this region is supported by:

  • IT professionals working in Manyata Tech Park
  • Aerospace and manufacturing professionals
  • Airport staff and aviation sector employees

Typical 2–3 BHK rental range in North Bangalore (2026): ₹28,000 – ₹45,000 per month, depending on the project and amenities.

Average rental yields generally range between 3% – 4.5%, depending on acquisition cost.

6. Large-Scale Planned Development

North Bangalore differs from older areas such as RT Nagar or Indiranagar in terms of urban planning.

  • Larger land parcels supporting township-style developments
  • Wider arterial roads along the NH 44 corridor
  • Satellite Town Ring Road (STRR) improving outer connectivity
  • KIADB industrial zoning encouraging structured development

The region forms part of Bangalore’s long-term airport-led northern expansion corridor.

Educational Institutions Near Purva Northern Lights

Several established schools and universities are located within driving distance of the project.

Institution Distance / Time Curriculum Key Highlight
Stonehill International School 9 km (15–20 mins) IB International campus near the airport offering global curriculum.
Delhi Public School North 12 km (20–25 mins) CBSE Well-known CBSE institution with strong academic reputation.
Vidyashilp Academy 14 km (25–30 mins) ICSE, ISC Established school known for academics and extracurricular programs.
REVA University 10 km (20 mins) UG & PG Programs Large university offering engineering and management courses.
Canadian International School 15 km (25–30 mins) IB, IGCSE International school with a diverse global student community.

Healthcare Infrastructure Near Purva Northern Lights

Residents have access to multiple hospitals and healthcare centres in North Bangalore.

Hospital Distance / Time Key Specialties Highlight
Sparsh Hospital 8 km (15 mins) Orthopedics, Emergency Known for bone and joint treatments.
Narayana Health 10 km (20 mins) Cardiac Care Part of a major healthcare network in India.
Columbia Asia Hospital Hebbal 14 km (25 mins) Multi-specialty Established private hospital serving North Bangalore.
Aster CMI Hospital 16 km (30 mins) Cardiac, Neuro NABH-accredited hospital with modern medical facilities.
Manipal Hospital Yelahanka 12 km (20 mins) Multi-specialty Trusted hospital for residents in the Yelahanka region.

Major Employment Hubs Near Purva Northern Lights

One of the key drivers of residential demand in this location is its proximity to North Bangalore’s established and emerging employment hubs.

Business Hub Distance / Time Type 2026 Status
Manyata Tech Park 18 km (30–35 mins) IT Park One of Bangalore’s largest technology parks.
Kirloskar Business Park 16 km (30 mins) Business Park Major office hub near Hebbal.
Bhartiya City Tech Park 15 km (30 mins) Mixed-use IT Integrated township with office and residential components.
Embassy Business Park 14 km (25–30 mins) IT & Corporate Premium office development near Hebbal Flyover.
RMZ Galleria Tech Offices 13 km (25 mins) Retail + Office Mixed commercial development in Yelahanka.
Devanahalli Business Park 20 km (35–40 mins) Upcoming Business Zone Growing commercial zone near the airport corridor.

Lifestyle & Entertainment Centres Near Purva Northern Lights

The project also benefits from access to several shopping, dining, and entertainment destinations in North Bangalore, supporting everyday convenience and leisure needs.

Destination Distance / Time Key Features Popular For
RMZ Galleria Mall 13 km (25 mins) Shopping & Multiplex Daily shopping and movie outings.
Bhartiya Mall of Bengaluru 15 km (30 mins) Large Mall Fashion brands and food court options.
Elements Mall 14 km (25–30 mins) Retail & Cinema Family shopping and entertainment.
Esteem Mall 16 km (30 mins) Retail Stores Convenient access near Hebbal Flyover.
Orion Mall Hebbal 18 km (30–35 mins) Premium Mall Shopping and entertainment experiences.

Purva Northern Lights is among the most well-connected luxury apartment projects in Bagaluru, offering fast access to employment hubs, airport infrastructure, and upcoming metro corridors.

Bagalur Road Apartments

Aerial view of Bagalur North Bangalore near Purva Northern Lights

Purva Northern Lights in Bagalur is a flagship residential township by Puravankara Group. Strategically located in North Bangalore, the project offers a sophisticated range of 1, 2, 3, and 4 BHK luxury apartments. It is meticulously designed for modern families and C-suite professionals working in the burgeoning aerospace and IT corridors.

Bagalur has evolved into a high-demand micro-market, primarily due to its proximity to the Kempegowda International Airport (BIAL) and the 3000-acre KIADB Aerospace SEZ. The area is witnessing a transition from an industrial zone to a holistic residential destination, offering a better quality of life with significantly lower pollution levels compared to East Bangalore.

Top Reasons to Invest in Bagalur Real Estate

  • Global Employment Hub: Minutes away from the upcoming Foxconn iPhone Plant and established campuses of Shell and Boeing.
  • Connectivity: Excellent reach via the SH-104 (Bagalur Main Road), STRR, and the Bellary Road (NH 44).
  • Future Infrastructure: Beneficiary of the Peripheral Ring Road (PRR) and the Phase 2B Airport Metro line.
  • Proximity to BIAL: Located just 12 km from the airport, ideal for frequent flyers and airport staff.
  • Educational Institutions: Surrounded by elite schools like Stonehill International and Delhi Public School (North).
  • High ROI: Bagalur properties have shown consistent double-digit appreciation due to government-led industrial growth.

Bagalur’s Social Infrastructure & Lifestyle

Residents of Purva Northern Lights will enjoy easy access to premium lifestyle hubs. Shopping destinations like Bhartiya Mall of Bengaluru and the upcoming Phoenix Mall of Asia are within a 20-minute drive. Leading healthcare facilities, including Aster CMI and Manipal Hospital (Hebbal), provide world-class medical support nearby.

With the trust of Puravankara Limited and the strategic positioning of Bagalur, this project stands as the most secure and high-growth investment opportunity in North Bangalore for 2026.

KIADB Hardware Park: The Future of North Bangalore

Purva Northern Lights project near KIADB Hardware Park Bagalur

Purva Northern Lights is a premium residential township located within the KIADB Aerospace & Hardware Park ecosystem. This pre-launch project by Puravankara Group offers a rare opportunity to live in a government-backed high-tech corridor in Bagalur, North Bangalore.

Advantages of Investing in Hardware Park, Bagalur

  • Strategic Hub: Immediate proximity to KIADB Aerospace Park, Shell, and Boeing R&D centres.
  • Appreciation Potential: High growth zone with massive government infrastructure funding.
  • Elite Connectivity: Seamless access to NH 44 (Bellary Road), SH 104, and the Airport Expressway.
  • High Rental Yield: Massive demand from aerospace, IT, and defense professionals working within the SEZ.
  • Upcoming Metro: Close to the Blue Line Metro extension connecting to the International Airport.

What is KIADB Hardware Park?

Managed by the Karnataka Industrial Areas Development Board (KIADB), Hardware Park is a specialized 3,000-acre zone dedicated to IT hardware, electronics, and aerospace R&D. It falls under the Information Technology Investment Region (ITIR), making it the primary economic engine of North Bangalore.

Connectivity & Infrastructure Highlights

  • Airport Access: Just 15-20 minutes from Kempegowda International Airport (BIAL).
  • Business Hubs: 5 minutes from the Shell Technology Centre and Boeing India Campus.
  • Road Network: Direct access to the Satellite Town Ring Road (STRR) and Peripheral Ring Road (PRR).
  • Healthcare: Quick access to Aster CMI Hospital, Manipal Hospital (Hebbal), and Relive Hospital.

Hardware Park Pin Code & Quick Facts

  • Pin Code: 562149
  • Primary Access: SH 104 (Bagalur Main Road) / NH 44
  • Location: KIADB Industrial Area, Huvinayakanahalli, Bengaluru, Karnataka.
  • Status: Rapid infrastructure expansion with 100-ft wide arterial roads.

KIADB Aerospace Park

KIADB Aerospace Park is a major industrial zone developed by the Karnataka Industrial Areas Development Board (KIADB) in North Bengaluru, Karnataka. Spread across approximately 3,000 acres, the park is strategically located near Kempegowda International Airport and is specially designed to support the aerospace and defence industries.

The park offers robust infrastructure including wide internal roads, reliable power and water supply, and modern industrial facilities. Excellent connectivity to highways, rail networks, and the airport makes it a preferred destination for global and Indian aerospace companies, manufacturing units, and research centres.

KIADB Aerospace Park Location

KIADB Aerospace Park is located in North Bengaluru, close to Bagalur and Devanahalli. It enjoys seamless connectivity via NH-44 (Bellary Road), ensuring smooth access to the airport, city centre, and major business hubs. Public transport options such as BMTC buses, private buses, and app-based cabs are easily available.

History and Growth of the Area

North Bangalore was once a calm and less-developed part of the city. Over the years, better planning and major road upgrades helped the region grow steadily. With improved connectivity, several large companies started setting up offices in the area.

To meet the rising demand, new residential projects, schools, hospitals, and shopping hubs also came up. Today, North Bangalore is one of the most well-planned zones in the city and offers strong long-term potential for living and investment.

Job Opportunities & Economic Growth

The Aerospace Park generates extensive employment opportunities for engineers, technicians, and skilled professionals. It also supports ancillary industries including logistics, security, maintenance, and local services. KIADB Aerospace Park plays a vital role in strengthening Karnataka’s position as a global aerospace hub and contributes significantly to regional economic growth.

Distance from Key Places to Purva Northern Lights

Key Location Distance / Travel Time
Kempegowda International Airport 12 km (15–20 mins)
Bagalur Town 2.5 km (5 mins)
Upcoming Doddajala Metro Station 3 km (7 mins)
REVA University 10 km (12 mins)
Delhi Public School (North) 11 km (15 mins)
Bhartiya Mall of Bengaluru 12 km (15–20 mins)
Devanahalli Fort 14 km (20–25 mins)
Yelahanka Junction 14 km (20–25 mins)
Manyata Tech Park 17 km (25–30 mins)
Hebbal 21 km (30–35 mins)
Aster CMI Hospital 22 km (35 mins)
Nandi Hills 35 km (40–50 mins)

Why Invest Near KIADB Aerospace Park

  • Close proximity to major industrial, aerospace, and IT hubs
  • High housing demand from working professionals
  • Planned infrastructure with better roads and utilities
  • Proposed Peripheral Ring Road (PRR) connectivity
  • Ideal for long-term investment and stable capital growth

Nearby IT Parks & Business Hubs

IT / Business Hub Travel Time
Shell Technology Centre 1 km (3–5 mins)
Boeing India Tech Centre 1 km (3–5 mins)
SAP Labs India 2 km (5–6 mins)
IFCI Financial City 5 km (10–12 mins)
Prestige Tech Cloud Park 11 km (15–20 mins)
Doddaballapur Integrated Park 16 km (25–30 mins)
Manyata Embassy Business Park 18 km (30–40 mins)

Puravankara North Bangalore

Exterior view of Purva Northern Lights luxury apartments in KIADB Hardware Park, North Bangalore

Purva Northern Lights in Hardware Park is a cornerstone of the North Bangalore real estate market in 2026. Situated within the 3,000-acre KIADB Aerospace SEZ, this project is perfectly positioned to benefit from the massive influx of global tech giants and the expansion of the Kempegowda International Airport.

Known as the "Silicon Valley of India," Bangalore remains the top choice for NRIs and domestic investors. The development of the Peripheral Ring Road (PRR) and the Airport Metro Blue Line has specifically made Hardware Park and Bagalur the most lucrative zones for capital appreciation and high rental yields.


Top Puravankara Residential Projects in Bangalore (2026)

Explore the best investment-grade properties by Puravankara Limited:

  • Purva Northern Lights – The premier new launch in Hardware Park (Bagalur).
  • Purva Zenium – Award-winning smart homes near the International Airport.
  • Purva Atmosphere – Ultra-luxury wellness homes in Thanisandra.
  • Purva Blubelle – Luxury 3 BHK residences on Magadi Road.
  • Purva Meraki – Elite boutique apartments in HSR Layout.
  • Purva Park Hill – Scenic hillside apartments off Kanakapura Road.

Strategic Investment: Why Bagaluru?

Located within the 3000-acre KIADB Aerospace SEZ, Purva Northern Lights offers unmatched connectivity. It is positioned just 15 minutes from Kempegowda International Airport and in close proximity to global tech giants like Shell, Boeing, and Rolls Royce.

With the upcoming Metro connectivity and high-speed rail links, Bagaluru is projected to be the next "Whitefield" of Bangalore. For investors, this translates to high rental yields and exponential capital appreciation, backed by the legacy and trust of the Puravankara brand.

Is North Bangalore a good investment area in 2026?

North Bangalore has transitioned from a "high-potential" zone to the city's primary economic engine. The synergy of multi-modal transit and industrial clusters makes it the most resilient real estate micro-market in Karnataka.

1. Namma Metro Blue Line (Airport Corridor)

The Blue Line (Phase 2B) is now in its final commissioning stages. With trial runs underway between KR Puram and KIAL, the "Metro Effect" is already being felt. Properties within a 2-km radius of stations like Doddajala and Aerospace Park are seeing a premium on rental yields as the 2026–27 operational deadline nears.

2. STRR (Satellite Town Ring Road) Economic Impact

The STRR is no longer just a road; it is a logistics backbone. By bypassing the city core to link Devanahalli with Doddaballapur and Hoskote, it has unlocked 20–30% capital appreciation in peripheral land values. It is the primary driver for the rise of "Satellite Luxury" townships.

3. Peripheral Ring Road (PRR) & NH-44 Integration

The integration of the PRR with NH-44 (Bellary Road) has effectively de-congested the Hebbal flyover bottleneck. This connectivity makes North Bangalore the most accessible quadrant for professionals working in both the East (Whitefield) and the West (Tumkur Road).

4. Bangalore Suburban Rail Project (BSRP)

The BSRP is the "silent winner" for 2026. By providing high-frequency rail links to Yelahanka and Devanahalli, it has expanded the commuter zone, making North Bangalore viable for a much broader demographic of mid-level management professionals.

5. Devanahalli Special Investment Region (SIR)

The 3,100-acre SIR designation provides a unified regulatory framework, making it a "haven" for institutional investors. It is a governance-led approach that ensures residential demand is supported by high-quality commercial and industrial infrastructure.

6. BLR Airport: The Global Gateway & Aero City

With Terminal 2 operating at peak capacity and Bengaluru Aero City evolving into a world-class business district, the airport corridor has become a self-sustaining ecosystem. It is not just a transit point anywhere. It is now a global business hub,

7. KIADB Aerospace SEZ: The Employment Engine in North Bangalore

The presence of global giants like Boeing, Airbus, and Shell within the Aerospace SEZ has created a high-income tenant base. This "Work-from-Near-Home" trend is the primary driver behind the success of premium gated communities in the Bagalur-Devanahalli belt.

8. Emerging Micro-Market Appreciation

trategic pockets like Bagalur Road and Shettigere have emerged as the "New Hebbal." With proximity to the International Airport and the KIADB tech hubs, it is a unique entry point for investors seeking high-growth assets that offer immediate appreciation.

Arrow icon Amenities & Features

The amenities at Purva Northern Lights are curated to support a modern lifestyle with wellness zones, sports facilities, family-friendly spaces, and advanced safety features. The township is designed to deliver a premium community experience for residents of all age groups.

Purva Northern Lights Amenities – 80+ Lifestyle Experiences

Purva Northern Lights offers over 80 lifestyle amenities designed for fitness, relaxation, recreation, and community living. Inspired by the concept of “Homes Choreographed by Nature”, the project combines modern residential architecture with landscaped green spaces to create a balanced living environment.

Located on Bagalur Road, the township provides spaces to exercise, socialize, and relax within the community itself. The development is planned as a complete residential ecosystem where everyday lifestyle needs are available close to home.

The Clubhouse – A 1 Lakh Sq Ft Lifestyle Hub

The clubhouse serves as the central recreational and social hub of the township. Spread across approximately 1 lakh sq ft, it offers a wide range of indoor and leisure facilities.

  • Grand Clubhouse (~75,000 sq ft) – A large indoor facility for fitness activities and social gatherings.
  • Poolside Clubhouse (~25,000 sq ft) – A dedicated space designed for water recreation and relaxation.
  • Olympic-Size Swimming Pool – Suitable for both training and recreational swimming.
  • Indoor Sports Arena – Indoor courts and gaming spaces for year-round sports.
  • Wellness Centre – Includes a modern gymnasium and yoga spaces.
  • Work & Social Spaces – Co-working areas, lounges, and party halls.

80+ Lifestyle Experiences

The amenities are organized into three lifestyle zones designed to support different activities and resident preferences.

  • Active Living – Sports courts, jogging tracks, and outdoor fitness areas.
  • Leisure Living – Landscaped gardens, amphitheatre, and viewing decks.
  • Family Living – Children’s play zones and recreational spaces for all age groups.

Retail Boulevard – Everyday Convenience

The project includes a Retail Boulevard that brings daily conveniences within walking distance for residents.

  • Retail Plaza (~76,000 sq ft) – A dedicated commercial space for shopping and services.
  • Cafes & Dining – Spaces for casual dining and social gatherings.
  • Daily Essentials – Provision for grocery stores and convenience outlets.

Safe & Smart Living Features

  • 24/7 Security – Multi-layered security system supported by CCTV monitoring.
  • Eco-Friendly Infrastructure – Smart waste and water management systems.
  • 100% Power Backup – Backup power for uninterrupted services.
  • High-Speed Elevators – Modern lifts in residential towers.
  • Parking Facilities – Dedicated resident and visitor parking areas.

Overall, Purva Northern Lights blends modern amenities with landscaped green spaces to create a residential community where fitness, recreation, and convenience are integrated within the township.

Lifestyle & Wellness

  • ClubhouseClubhouse
  • GymnasiumGymnasium
  • Yoga deckYoga Deck
  • Jogging trackJogging Track
  • Swimming poolSwimming Pool
  • Indoor games facility for residents at Purva Northern LightsIndoor Games

Sports & Recreation

  • Premium sports and recreation facilities at Purva Northern LightsSports Facilities
  • Professional-grade badminton court at Purva Northern LightsBadminton Court
  • Basketball courtBasketball Court
  • Table tennisTable Tennis
  • Cricket practice areaCricket Practice
  • Cycling trackCycling Track

Kids & Family Zones

  • Kids play areaKids Play Area
  • Multipurpose hallMultipurpose Hall
  • AmphitheatreAmphitheatre
  • Landscaped gardensLandscaped Gardens
  • Senior citizen zoneSenior Citizen Zone

Convenience & Utilities

  • Car parkingCar Parking
  • High-speed liftsHigh-Speed Lifts
  • Power backupPower Backup
  • Water storageWater Storage
  • Waste disposalWaste Disposal
  • Maintenance staffMaintenance Staff

Safety & Security

  • 24/7 security24/7 Security
  • CCTV surveillanceCCTV Surveillance
  • Intercom facilityIntercom Facility
  • Fire safetyFire Safety
  • Wi-Fi connectivityWi-Fi Connectivity



World-Class Lifestyle Amenities

Wellness & Sport

  • Infinity-edge Swimming Pool
  • Fully equipped Gym & Yoga Studio
  • Cycling & Jogging Tracks
  • Badminton, Basketball & Tennis Courts

Social & Leisure

  • Multi-level Clubhouse & Café
  • Co-working & Business Lounge
  • Reading Lounge & Mini Theater
  • Pet Parks & Kids' Play Zone

Green & Smart

  • Smart Home Automation
  • Solar Power & Rainwater Harvesting
  • Multi-tier 24/7 Surveillance
  • Landscaped Thematic Gardens

RERA, Approvals & Legal Documentation

Registration under RERA (Real Estate Regulatory Authority) provides an additional layer of transparency and accountability for buyers investing in Purva Northern Lights. The regulation requires developers to follow defined timelines, maintain financial discipline, and adhere to approved construction standards.

Safe Buying: As per RERA regulations, 70% of the project funds must be deposited in a separate escrow account. This ensures that the collected funds are used only for construction and land-related expenses of the project.

Bank Loans: Most financial institutions approve home loans only for projects that have valid RERA registration and legally verified land titles, which adds an extra layer of confidence for buyers.

Project Approval & RERA Registration

The project has received approval from KIADB (Karnataka Industrial Areas Development Board) and is registered under Karnataka RERA in three phases.

  • Approving Authority: KIADB
  • Approved Plan Number: DO3-KIADB-00190/25-26/BP
  • Plan Approval Date: March 07, 2026
Phase RERA Registration Number
Phase 1 PRM/KA/RERA/1251/309/PR/120326/008523
Phase 2 PRM/KA/RERA/1251/309/PR/120326/008524
Phase 3 PRM/KA/RERA/1251/309/PR/120326/008525

Official RERA Link: Karnataka RERA Portal


Project Status & Possession Timeline

As of March 13, 2026, Purva Northern Lights is launched. The project is planned as an integrated luxury township where the overall design concept reflects the theme “Choreographed by Nature.”

Milestone Details / Timeline
Pre-Launch / EOI Start March 01, 2026
RERA Approval Received March 12, 2026
Tentative Pre-Launch March 15, 2026
Current Status Pre-Launch / EOI Collection
Construction Stage Site clearing and internal road mapping
Expected OC Date November 25, 2029
Final Handover January 31, 2030 onwards

Bank Approvals & Home Loan Partners

Puravankara Limited, the developer of Purva Northern Lights, has an established track record in the Indian residential real estate sector. With approvals from Karnataka RERA and KIADB in place, most major financial institutions are expected to provide home loan assistance for eligible buyers.

Buyers Can Expect

  • Competitive interest rates offered by leading financial institutions
  • Flexible repayment tenures based on buyer eligibility
  • Home loan assistance from major nationalized and private banks

Ownership & Land Details

  • Khata Number: 150200201200325130
  • Land Owner: KVN Property Holdings LLP (100% Share)
  • Type of Khatha: E-Khatha issued by Panchayati Raj
  • Land Extent: 99,515.73 sq. meters

Approvals & Legal Status

Legal and Approvals Status for Purva Northern Lights

Purva Northern Lights is planned on a clear-title land parcel with E-Khata approval. The project falls under the jurisdiction of BIAAPA and the KIADB Aerospace Park Planning Authority, ensuring that all zoning and development regulations are properly followed.

The project has the required approvals from relevant authorities such as KIADB, and applicable local planning bodies. This confirms the land status is valid and the development is being done as per approved norms. Buyers can confidently proceed, as the land is legally verified and compliant.

Purva Northern Lights has a clear legal title with no known disputes or pending issues. The project is currently in the pre-launch stage, and RERA registration is approved. The official RERA number is PR/120326/008523.

At present, the Expression of Interest (EOI) is open, allowing early buyers to access early-bird benefits.

Purva Northern Lights has strong financial tie-ups, and leading banks have initiated the approval process to support buyers with smooth loan disbursements. The project is associated with top banks such as:

  • SBI
  • HDFC Bank
  • ICICI Bank
  • Axis Bank

These tie-ups make home loan processing easier and give buyers flexible financing options, making the purchase simple and convenient.

All key legal and property documents are expected to be maintained and provided as applicable, ensuring a safe and transparent buying process. Important documents include:

  • Layout Plan Approval
  • Sale Deed
  • Mother Deed
  • Agreement of Sale and Purchase
  • Encumbrance Certificate (EC)
  • Khata Certificate
  • RERA Certificate (after approval)
  • Completion Certificate (as per project stage)
  • Possession Letter (at handover stage)

These documents ensure that the purchase process remains legal, secure, and hassle-free.

Taxes & Standards (2026 Guidelines)

  • GST: 5% (applicable only on under-construction residential apartments; nil for ready-to-move units with OC).
  • Stamp Duty: 5% (for properties above ₹45 Lakhs in Karnataka).
  • Registration: 1% of the total agreement/market value.
  • Maintenance: Approx. ₹4 – ₹6 per sq. ft./month (indicative; finalized by the association at possession).

Reviews & Investment

⭐⭐⭐⭐.5
Customer Sentiment

Homebuyers appreciate the spacious 1, 2, 3, and 4 BHK layouts and the 1 Lakh sq. ft. clubhouse. The 80% open green space is a frequently cited positive for families and remote professionals.

📈
Expert Analysis

Analysts rank this as a top-tier investment for 2026. Proximity to the Aerospace SEZ and the upcoming Metro Blue Line are primary catalysts for the projected 20-30% capital appreciation.

💰
Investment Yield

With major tech and aerospace hubs operational, rental yields in Hardware Park are trending above the Bangalore average. The Puravankara legacy ensures high resale liquidity and trust.

⭐⭐⭐⭐.5
Customer Sentiment

Homebuyers appreciate the spacious 1, 2, 3, and 4 BHK layouts and the 1 Lakh sq. ft. clubhouse. The 80% open green space is a frequently cited positive for families and remote professionals.

📈
Expert Analysis

Analysts rank this as a top-tier investment for 2026. Proximity to the Aerospace SEZ and the upcoming Metro Blue Line are primary catalysts for the projected 20-30% capital appreciation.

💰
Investment Yield

With major tech and aerospace hubs operational, rental yields in Hardware Park are trending above the Bangalore average. The Puravankara legacy ensures high resale liquidity and trust.

About Puravankara Limited

Puravankara Limited 50 Years Golden Jubilee Logo

Puravankara Limited is one of India’s most trusted real estate developers, headquartered in Bengaluru. Established in 1975, the company celebrated its 50th Anniversary in 2025, a milestone marked by the release of a commemorative stamp by India Post.

With five decades of expertise, the group has completed over 92 projects spanning approximately 54 million sq. ft. across 9 major cities. Known for their "WorldHome Collection" and themed townships, Puravankara is a pioneer in luxury, technology-driven, and sustainable living solutions.

80,000+

Happy Families

9+ Cities

National Presence

Puravankara Upcoming Projects in Bangalore 2026

Purva Codename AI – Bellandur, South-East Bangalore

Featured Image of Purva Codename Da Vinci

Purva Codename AI offers 1, 2 & 3 BHK apartments with smart layouts and modern finishes. Spread across 3.9 acres, the project comprises 3 residential towers with thoughtfully planned open spaces. Possession is expected from December 2028.

Purva Codename Infinity – Chikkajala, International Airport Road

Featured Image of Purva Codename Infinity

Purva Codename Infinity offers 1, 2, 3 & 3.5 BHK apartments close to the airport with immense layouts andpremium amenities. Spanning over 7.5 acres, it has 2 high-rise towers with well-planned open spaces. In2028, it will be officially in possession. The project is ideal for those seeking luxury living with easyaccess to the airport.

Puravankara Ongoing Projects in Bangalore

Purva Atmosphere – Thanisandra Road
Featured Image of Purva Atmosphere

Purva Atmosphere is a current residential project on Thanisandra Road, Bangalore. It provides 2, 3, and 4BHK apartments in spacious towers, with prices starting at ₹2.85 Crores.

The size of the units is:

  • 2 BHK – 1680 sq.ft. onwards
  • 3 BHK – 2000 sq.ft. onwards
  • 4 BHK – 2500 sq.ft. onwards

Purva Blubelle – Magadi Road

Featured Image of Purva Blubelle

Purva Blubelle is an ongoing township on Magadi Road, Bangalore. The project features 3 BHKapartments with modern layouts and amenities. The prices start from ₹2.25 Crores.

The size of the units is:

  • 3 BHK L Type 1 – 1434 sq.ft. onwards
  • 3 BHK R Type 2 – 1450 sq.ft. onwards

Purva Park Hill – Kanakapura Road

Featured Image of Purva Park Hill

Purva Park Hill is located off Kanakapura Road, Bangalore. The project offers 3 BHK apartments in agreen and open environment. The starting price is ₹2.02 Crores.

The size of the units is:

  • 3 BHK – 1748 sq.ft. onwards

Purva Celestial – International Airport Road

Featured Image of Purva Celestial

Purva Celestial is an ongoing residential township near the International Airport Road, Bangalore. Itoffers 2 & 3 BHK apartments with modern amenities. The starting price is ₹1.01 Crores.

The size of the units is:

2 & 3 BHK apartments | Starting from ₹1.01 Cr

  • 2 BHK – 1034 sq.ft. onwards
  • 3 BHK – 1200 sq.ft. onwards

Purva Meraki – HSR Layout

Featured Image of Purva Meraki

Purva Meraki is located in HSR Layout, Bangalore. The township offers spacious 3 BHK apartments withpremium finishes. The starting price is ₹3.90 Crores.

The size of the units is:

3 BHK apartments | Starting from ₹3.90 Cr

  • 3 BHK – 2519 sq.ft. onwards

Purva Sparkling Springs – Bannerghatta Road

Featured Image of Purva Sparkling Springs

Purva Sparkling Springs is an ongoing project on Bannerghatta Road, Bangalore. It offers 3 and 4-BHKvillas with enormous open spaces. The prices start from ₹4.80 Crores.

The size of the units is:

3 & 4 BHK villas | Starting from ₹4.80 Cr

  • 3 BHK – 3335 sq.ft. onwards
  • 4 BHK – 3500 sq.ft. onwards

Puravankara Completed Projects in Bangalore

Purva Sunflower – Rajajinagar

Featured Image of Purva Sunflower

Purva Sunflower is located off Rajajinagar, Bangalore. This project offers 2 BHK apartments with well-planned layouts and modern amenities.

The size of the units is:

  • 2 BHK – 1216 sq.ft. onwards

Purva 270 – C.V. Raman Nagar

Featured Image of Purva 270

Purva 270 residential township is located in C.V. Raman Nagar, Bangalore. It offers 3 BHK apartmentsdesigned for comfortable living.

The size of the units is:

  • 3 BHK – 1788 sq.ft. onwards

Purva Skydale – Sarjapur Road

Featured Image of Purva Skydale

Purva Skydale is situated on Sarjapur Road, Bangalore. The township provides ample 3 BHK apartmentswith modern finishes and amenities.

The size of the units is:

  • 3 BHK – 1700 sq.ft. onwards

Purva Whitehall – Sarjapur Road

Featured Image of Purva Whitehall

Purva Whitehall township is located on Sarjapur Road, Bangalore. The township offers premium 4 BHKapartments with spacious open spaces and greenery.

The size of the units is:

  • 4 BHK – 2252 sq.ft. onwards

Frequently Asked Questions

Everything you need to know about Purva Northern Lights


The project is located inside the KIADB Aerospace & Hardware Park on Bagalur Road, North Bangalore. It is situated just 10 minutes from the upcoming Doddajala Metro Station and 15 minutes (8 km) from Kempegowda International Airport.

Purva Northern Lights is a RERA-approved project. The registration numbers are:

  • Phase 1: PRM/KA/RERA/1251/309/PR/120326/008523
  • Phase 2: PRM/KA/RERA/1251/309/PR/120326/008524
  • Phase 3: PRM/KA/RERA/1251/309/PR/120326/008525

The project spans 24.55 acres and features 8 iconic high-rise towers (B+G+31 floors). The township offers approximately 2,973 premium apartments across three phases.

The project offers a variety of sizes to suit different needs:

  • 1 BHK: 408 sq. ft.
  • 2 BHK: 670 to 768 sq. ft.
  • 3 BHK: 1,003 to 1,077 sq. ft.
  • 4 BHK: 2,235 to 2,332 sq. ft.

Purva Northern Lights focuses on maximum space utilization, maintaining a high 70% to 75% usable internal area. The floor plans are designed to eliminate long corridors and wasted corners.

Yes, the project follows strict Vaastu Shastra principles. Units feature East and West-facing entrances, with kitchens and bedrooms strategically positioned to ensure positive energy and ample natural lighting.

Prices start from ₹80 Lakhs* for 1 BHK units, making it one of the most competitive luxury offerings in the KIADB Aerospace corridor.

The project features 80+ lifestyle experiences, including a 1-lakh-sq-ft mega clubhouse, co-working spaces, a 76,000 sq. ft. retail plaza, an indoor heated pool, and 80% open green spaces.

The targeted completion date is December 2029, with official handover and possession starting from January 15, 2030.

Yes, the project has a clear, marketable title with E-Khata approval from the BDA and the Aerospace Hardware Park Planning Authority, making it eligible for home loans from all major banks.

Yes, the master plan and individual floor plans for Purva Northern Lights have undergone a professional Vastu audit to ensure positive energy flow, focusing on entry orientations and kitchen placement

Yes, Purva Northern Lights is designed as a pet-friendly township, featuring dedicated pet parks and open green spaces for residents' companions.

Purva Northern Lights is strategically located just 15-20 minutes from Yelahanka and approximately 15 minutes from Kempegowda International Airport via the Aerospace Park corridor.

Purva Northern Lights stands out due to its 80% open green space, a massive 1-lakh-sq-ft clubhouse, and its status as a 24.55-acre integrated luxury township compared to smaller, standalone developments in the area.

Early investors in March 2026 can benefit from EOI (Expression of Interest) special pricing, priority unit selection, and potential appreciation as the Aerospace Park infrastructure matures.

Blog

Explore all updates, guides, price details, location advantages and related Puravankara projects.

Puravankara & Other Projects

More Blogs
























×